ProjectsTopographic Survey for High Voltage Power Line Infrastructure 400kV
InfrastructurăEnergieCoridorExproprieri

Topographic Survey for High Voltage Power Line Infrastructure 400kV

Study corridor for high voltage overhead power line (LEA) rehabilitation in Craiova metropolitan area. Obstacle identification, utility crossings, longitudinal profiles and site plans for design.

Location

Craiova, Dolj county

Area

12 km liniari

Accuracy

±2 cm

Date

2024-03

Project Steps

1Corridor surveys
2Conductor height and sag measurement
3Longitudinal profiles

Gallery

Gallery image 1
Gallery image 2
Gallery image 3
Gallery image 4

Datasets

Metadata

EPSGEPSG:3844
Coordinates44.319, 23.795
ClientEnergy company
Accuracy±2 cm
Datasets0

Deliverables

  • Site plan
  • Longitudinal profiles
  • Pylon coordinate table