ProjectsTopographic Survey for High Voltage Power Line Infrastructure 400kV
InfrastructurăEnergieCoridorExproprieri
Topographic Survey for High Voltage Power Line Infrastructure 400kV
Study corridor for high voltage overhead power line (LEA) rehabilitation in Craiova metropolitan area. Obstacle identification, utility crossings, longitudinal profiles and site plans for design.
Location
Craiova, Dolj county
Area
12 km liniari
Accuracy
±2 cm
Date
2024-03
Project Steps
1Corridor surveys
2Conductor height and sag measurement
3Longitudinal profiles
Gallery




Datasets
Metadata
EPSGEPSG:3844
Coordinates44.319, 23.795
ClientEnergy company
Accuracy±2 cm
Datasets0
Deliverables
- Site plan
- Longitudinal profiles
- Pylon coordinate table